Hello steem world! This is our 3rd day at MEPFS Department, our second to the last day for this. Early in the morning, we immediately went to tower 5 for checking.

image image image

Here you can see the pumpcrete going through the floors up to the roof deck. It is used for, of course, for concreting. image

We also saw the progress of the stairs in my last post. It has a concrete slab already! image

We then went to the 4th floor of the tower because we need to check the surveyed area. image image image image

Upon arriving, we noticed that the dowels were not aligned to the survey! It was a disaster waiting to burst. image

We double checked and measure the area. image

The supervisor realized that the plan used by the surveyor is different from his plan. So he instructed the surveyor to recheck and ask if what is the right plan. Moving on, we went. To the ground floor of the tower again for checking image image

Then, we went to the 2nd floor for supervision of the workers and I took a shot of the beautiful sky with the crane. image

Then we went to the other side of the basement, the lower one. It was like in a tunnel with lots of treasure haha. image

And this is the panel board of the side elevator of the building image

So basically that is all for today. Thank you for reading!!